1. Job details
Install bases are equipment-plus-standard-labor starting points — replace them with your own price-book values in section 3. Tonnage only scales install and ductwork jobs; repair and maintenance use the flat job base.
2. Parts & materials
| Item | Qty | Unit price ($) | Line total |
|---|
Parts are charged at the unit price you enter. To add markup, raise the unit price above your cost — profit is computed on the line totals as entered.
3. Rate settings (editable — these are the defaults, not hidden constants)
Grounded in 2026 anchors: 3-ton central install $7,000–$11,500; per-ton installed $2,500–$3,000 (standard) / $3,500–$5,000 (high efficiency); install labor $800–$4,000 basic, $2,500–$6,500 full ducted. Change any value and every quote updates instantly.
4. Quote
5. Job log (saved on this device only)
No saved jobs yet. Build a quote and press “Save job to log”.