ConcreteDesk

Offline concrete quote desk. One file, no account, no subscription, no internet needed. Your rates never leave your device. All default rates below are EDITABLE DEFAULTS — starting points, not market prices. Confirm ready-mix, bag, rebar, and gravel prices with your supplier before ordering or quoting. Dimensions in ft, thickness in inches.

1 · Pours — only the fields each shape needs are used
PourShapeLength (ft)Width (ft)Thick. (in)Height (ft)Diameter (ft)Qty

Slab / footing: volume = length × width × thickness. Wall: length × height × thickness. Round column: π × (diameter ÷ 2)² × height. Volume in ft³ ÷ 27 = yd³; the order adds waste % (default 10) and rounds UP to the nearest 0.25 yd. Bagged alternative: 80 lb bags yield 0.60 ft³, 60 lb yield 0.45 ft³, 40 lb yield 0.30 ft³.

2 · Concrete, extras & rates (editable defaults — NOT market prices)

Markup applies to concrete + rebar + gravel + forms only — never to labor, pump, short-load, or delivery. Rebar is a grid over the entered rebar area at the entered spacing, both directions, using #4 bar at 0.668 lb/ft — an approximation, not a structural design.

3 · Job details

Quote

Edit the pours and press Calculate quote.

Copyable quote

Job log (saved on this device only)

Planning estimate only — not a substitute for an on-site measure or a structural design. Rebar spacing and quantities must be confirmed against the project specification; this desk does not design reinforcement. Confirm slump, mix, and short-load terms with the plant before ordering, and never order on an unmeasured thickness.