Job
5-year: 2 correction steps + 2 hrs coating, $120 product.
Costs & floor
Presets
Presets load the three worked examples from the README. Package base prices: 2-yr $200 (0 steps, 1 hr coating, $40 product), 3-yr $600 (1 step, 2 hrs, $80), 5-yr $1,200 (2 steps, 2 hrs, $120), Lifetime $1,800 (3 steps, 3 hrs, $180). Labor hours = (2 prep + steps×4 + extra steps×4 + coating hrs) × size multiplier. Add-on cost = 40% of add-on price. Floor = costs × 1.20. Target = costs × 1.67 (about a 40% margin). Blank or negative numbers count as 0.
Quote
| Package base (× size) | $0.00 |
| Extra correction steps | $0.00 |
| Add-ons | $0.00 |
| Quoted price (before discount/tax) | $0.00 |
| Discount | -$0.00 |
| Tax | +$0.00 |
| Labor hours | 0.00 |
| Labor | $0.00 |
| Coating product | $0.00 |
| Add-on cost (40%) | $0.00 |
| Travel + overhead | $0.00 |
| Total costs | $0.00 |
| Floor (costs × 1.20) | $0.00 |
| Target (costs × 1.67) | $0.00 |
| Net profit | $0.00 |
| Margin % | 0.00% |
| Net $ / hour | $0.00 |
Quote text
Save to job log
Job log & monthly rollup
| Date | Client | Vehicle | Package | Quote | Costs | Net |
|---|
No jobs saved yet. Saved jobs live in this browser only (localStorage).
CoatDesk v1.0 — single file, no internet needed. All prices are defaults you can edit; change them to match your own costs before quoting a customer.